Construction Supervision , Independent Engineer, Authority Engineer

  • Design Review
  • Quality Assurance
  • Contract Administration
  • Operation and Maintenance
  • Safety & Traffic Management

List of Projects

  • IE Services during Operation & Maintenance Period for 4 laned stretch from Km. 367.000 (Adloor Yellareddy) to Km. 464.000 (Gundla Pochanpalli) (Contract Package No. NS-2/BOT/AP- 2) on Nagpur - Hyderabad Section of NH-44 (Old NH-7) in the state of Telangana on BOT (Annuity) Basis under North - South Corridor (NHDP Phase-II) and additional highway from Km. 464.000 (Gundla Pochanpalli) to Km. 474.000 (Bowenpalli); Client: NHAI; Length: 113.076 Kms. (4 Lane).
  • IE Services for Operation & Maintenance Period for DBFOMT (Hybrid Annuity) Contracts (i) Hassan – Piriyapatna road (WCP-3) -73.69 Kms. (ii) Hirekerur – Ranibennur road (WCP-5) - 55.69 Kms. (iii) Mundaragi – Harapanahalli road (WCP-6) - 51.21 Kms. Client: Karnataka Road Development Corporation Ltd. (KRDCL): Total Length: 180.59 Kms.
  • IE Services for Operation & Maintenance Period for Project Road of SH-10 from MH Border to AP Border via Aland, Gulbarga etc. in Gulbarga on PPP-BOT-VGF (Toll) Basis) (L=135.85 Kms). Client: Karnataka Road Development Corporation Ltd. (KRDCL).
  • IE Services during Operation & Maintenance stage of Six laning of Chilakaluripet – Vijayawada section of NH-5 (New NH-16) from Km. 355.000 to Km. 434.150 (length 82.5 Km) in the state of Andhra Pradesh executed as BOT (Toll) on DBFO Pattern under NHDP Phase-V; Client: NHAI; Length: 82.50 Kms. (6 Lane).
  • Consultancy Services as IE during Operation & Maintenance of four laning of Maharashtra/Karnataka border to Sangareddy Section of NH-09 (New NH-65) (From Km. 348+800 to Km. 432+800) in the state of Karnataka and Km. 428+800 to Km. 493+000 in the state of Andhra Pradesh) under NHDP Phase III DBFOT/BOT basis; Client: NHAI; Length: 112.2 Kms. (4 Lane).
  • Consultancy Services for Authority’s Engineer for Supervision for the works of 1) Strengthening of the reach from Km. 525.200 to Km. 537.600 of Raipur – Visakhapatnam section of NH-26 in the state of Andhra Pradesh on EPC mode on EPC, 2) Widening and Strengthening to two lane with Paved shoulders including Geometrical Improvements from Km. 491.000 to Km. 525.200 of Raipur – Visakhapatnam section of NH-26 in the State of Andhra Pradesh on EPC mode, 3) Construction of Bypass to Salur Town from Km. 486/831 to Km. 491/420 of Raipur – Visakhapatnam section of NH-26 in the state of A.P., 4) Construction of approaches to the existing 2 Lane ROB in lieu of L.C. No. RV 324 at Km. 436.12 13 between Komatipalli and Gajapathimagaram station at Km. 515.200 NH26 in the state of Andhra Pradesh on EPC mode. Client: MORTH, Length=52 Kms.
  • Consultancy Services as IE during Operation & Maintenance for two-lane with paved shoulders/four lane for Kerala Border to Kollegala section of NH-212 from Km.136.600 to Km. 268.475 in the State of Karnataka under NHDP Phase-IV (A); Client: NHAI; Length: 131.875 Kms. (2 lane with paved shoulders/4 lane).
  • Consultancy Services for Authority’s Engineer for Supervision of the project “Design and Construction / Improvement of Road Rajouri/ Thanamandi – Surankot on EPC Mode from existing Km. 3+900 to Km. 56+951 (Design Km. 3+900 to Km. 59+420) [Design Length – 55.520 Kms.] from existing IW/CL-9 Specifications to NHDL Specifications under 31 BRTF Area under Project Sampark in Jammu & Kashmir (UT). Client: BRO; Length: 55.520 Kms. (2 lane with Paved shoulders)
  • IE Services for Operation & Maintenance period of 4-lane divided Carriageway of Ulundurpet – Padalur section of NH-45 from Km. 192/750 to Km. 285/000 – Padalur – Trichy section of NH- 45 from Km. 285/000 to Km. 325/000 in the State of Tamil Nadu under NHDP Phase-III on BOT basis. Client: NHAI; Length: 132.32 kms (4 lane).
  • IE Services during Operation & Maintenance for Four laning of Hospet-Chitradurga section of NH-13 (New NH-50) from Km. 299+000 to Km. 418+750 in the State of Karnataka under National Highways Development Project (NHDP) Phase-III on DBFOT (Toll) basis. Client: NHAI; Length: 120 Kms. (4 lane).
  • Supervision Consultancy Services (SC) for Operation & Maintenance of NH-30 (old NH-221) from Ibrahimpatnam Circle (Km. 0.000) to AP/Telangana Border (Km. 71.200) (Pkg-I: Ibrahimpatnam Circle - Chandragudem & Pkg-II: Chandragudem - AP/Telangana Border) Section of two lanes with paved shoulders in the State of Andhra Pradesh. Client: NHAI; Length: 70 Kms. (2 lane).
  • Supervision Consultancy Services (SC) for Operation & Maintenance from Km. 198.694 to Km. 294.000 (Design chainage from Km. 198.694 to Km. 293.266) of Markapuram toVaggampalle Section of 2-lane with paved shoulder configuration of NH – 565 in the State of Andhra Pradesh. Client: NHAI; Length: 94.5 Kms. (2 lane).
  • Authority Engineer for Supervision of Construction of 6-laning with access control from Km. 29.435 to Km. 74.168 of Neelmangala-Tumkur including Tumkur bypass section of NH-48 (old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojana. Client: NHAI; Length: 45 Kms. (6 lane).
  • Authority Engineer for Supervision of Construction of 4 lane Connector from Delhi-Meerut Expressway Km. 50+000 of Pkg-4 to Km. 8+520 of NH-235 in the State of Uttar Pradesh on EPC Basis. Client: NHAI; Length: 14.600 Kms. (4 lane); Length: 324 Kms. (6 lane).
  • Independent Engineer Services from Km. 484.000 to Km. 580.700 of NH-16 under Tolling, Operation, Maintenance & Transfer (TOT) and O&M (Capacity Augmentation) from Km. 470.415(Icchapuram) at Odisha/AP Border to Km. 580.700(Narasannapeta) in the State of Andhra Pradesh. Client: NHAI; Length: 96.7 Kms. (4 lane).
  • Independent Engineer during Operation and Maintenance for the project of Design, Engineering, Finance, Construction, Operation and Maintenance of access-controlled highway project of Bangalore-Nelmangala section of NH-4 from Km. 10.000 to Km. 29.500 in the State of Karnataka on Build, Operate & Transfer (BOT) basis Client: NHAI, Length: 19.5 Kms
  • Independent Engineer Independent Engineer Services for Supervision of Borkhedi-Wadner- Deodhari-Kelapur-Maharashtra/Telangana Border (from Km 36+600 to Km 175+000 of NH-44, Old NH-7) on Toll, Operate, Maintain and Transfer basis (TOT InvIT Bundle 2), Client: NHAI, Length: 138.400 Kms
  • Consultancy Services for Authority’s Engineer for Supervision of “Widening & Strengthening to 2 Lane/4 lane with Paved Shoulder from Km 0+000 to Km 60+255 of Mahabubnagar -Chincholi Section of NH-167N in the State of Telangana. Client: MORTH, Length=60.255 Kms.
  • Consultancy Services for Authority’s Engineer for Supervision of “Widening to 2 Lane with Paved Shoulder from Km 0+000 to Km 45.946 of Nizampet-Narayankhed-Bidar Section of NH-161B in the State of Telangana. Client: MORTH, Length=45.946 Kms.
  • Independent Engineer for Operation & Maintenance of (i) Kayathar-Nanguneri from Km 116+500 to Km 180+000 & (ii) Nanguneri to Kanyakumari from Km 180+000 to Km 243+470 Section of NH-44(old NH-7) on TOT mode in the State of Tamilnadu Client: NHAI, Length: 126.97 Kms
  • Independent Engineer Services during Operation & Maintenance for a) Four laning of Trichy to Kallagam (from Km. 0.000 to Km.38.700) (Package-I), b) Four laning of Kallagam to Karuppur(from Km. 38.700 to Km. 50.382) & Two laning with Paved Shoulder from Karuppur to Meensurutti (from Km. 50.382 to Km. 98.433) (Package-II) & c) Two laning with Paved Shoulder of Meensurutti to Chidambaram(from Km. 98.433 to km. 129.965) (Package-III) section of NH-227 (New No.81) under Bharatmala Pariyojana on Hybrid Annuity Mode (HAM) (Residual Projects of NHDP) in the State of Tamil Nadu. Client: NHAI, Length: 129.965 Kms
  • Independent Engineer Services for National Highway Stretches of TOT Packages in the State of Andhra Pradesh for the Sections of (i) Anakapalli to Annavaram Section of NH16 from Km.741.255 to Km.830.525 (TOT)– Bundle-1 (Package-4) for a length of 88.532 Km (ii) Annavaram to Diwancheruvu Section of NH16 from Km. 830.525 To Km.901.500 (TOT) – Bundle-1 (Package-3) for a length of 70.975 Km (iii) Diwancheruvu to Siddhantham Section of NH216A from Km.901.500 to Km.950.542 (TOT) – Bundle-1 (Package-2) for a length of 49.042 Km & (Iv) Siddhantham to Gundugolanu Section of NH216A from Km 950.542 to Km 1022.494 (TOT) – Bundle-1 (Package-1) for a length of 71.952 Km .Client: NHAI, Length: 281.239 Kms
  • and many more projects…